You are viewing the technical directory listing for Smart Grid Modernization in Mongolia: Key Priorities. This engineering resource is curated under our Smart Energy division to support automation specialists, control systems engineers, and manufacturing technicians looking for verified reference materials.

🔍 Contextual Abstract & Technical Scope

Share Summary:LinkedInEmail

Smart grid modernization is not simply a matter of adding new control-room software. It requires reliable visibility across the network, systems that support effective dispatch and settlement, and people equipped to interpret changing grid conditions. Mongolia’s 2019 technical assistance plan set out these priorities as the country sought to expand renewable generation while managing the operational demands of a large, geographically dispersed power system.

The plan proposed a feasibility study and investment roadmap for a smart energy system using high-level technology. Its underlying challenge is familiar to many grid operators: as generation becomes more variable and transmission distances are long, timely monitoring and coordinated control become increasingly important to system stability.

Why smart grid modernization was a priority

Mongolia had set renewable energy targets of 20% of total generation by 2023 and 30% by 2030. At the time of the report, however, the national electricity management system (EMS) had been installed in 2006 and had limited capability for timely power dispatch and wholesale-market financial settlement among utilities and large consumers.

The supervisory control and data acquisition (SCADA) system used by the National Dispatching Center (NDC) monitored and controlled the grid, but covered a limited number of substations and was segmented by region. That limited visibility can complicate the task of understanding system conditions across a wider network and coordinating a response when operating conditions change.

Geography adds another layer of complexity. Transmission lines span long distances across a sparsely populated country, while major load centers are in the north and strong wind resources are in the south. Integrating wind and solar generation located far from demand can create additional challenges, including the risk of voltage instability. The report therefore emphasized the need to strengthen monitoring and control as renewable generation grows.

Four technology and planning priorities

The proposed feasibility work was intended to turn these challenges into an investment-ready plan. Rather than focusing on one device or platform, it examined several connected capabilities.

1. Improve metering data management

A metering data management system (MDMS) was proposed to upgrade and expand the existing automatic meter-reading system. Its purpose would be to improve the accuracy and transparency of wholesale energy transactions among generation, transmission and distribution companies. By connecting revenue-precision meters through SCADA and other systems, an MDMS could support payment processes between utilities. In practical terms, this makes metering and data management part of market operations, not just a back-office function.

2. Assess wide-area monitoring

The plan called for assessment of a synchro-phasor-based wide-area monitoring system (WAMS). Synchro-phasor measurements can provide information about grid conditions across a broad area. The report identified WAMS as a potential way to help restore power after a widespread blackout and reduce the possibility of future blackouts. Its proposed role was to strengthen the operator’s ability to assess system behavior across the network.

3. Extend SCADA and strengthen dispatch arrangements

The study was to propose expansion of SCADA from the central energy system to other regional energy systems. The plan also contemplated regional dispatching centers in western, eastern and southern Mongolia to supplement the NDC. Alongside this geographic expansion, it called for recommendations to upgrade the EMS, define the scope of work for regional centers and establish a backup control center.

Cybersecurity was included in this planning work. The report called for measures to counter cybersecurity risk, recognizing that expanded monitoring and control infrastructure must be considered together with the resilience of the systems supporting it.

4. Review flexibility, policy and market requirements

Technology alone cannot resolve every integration challenge. The proposed study would assess whether existing policy and market arrangements related to grid flexibility needed to change to support the smart energy system. It would also examine wholesale electricity market settlement practices in connection with the recommended MDMS. This links grid engineering decisions with the rules and processes that shape how power is scheduled and accounted for.

People and implementation matter

The plan paired technical assessment with capacity building for NDC staff. Proposed hands-on training covered MDMS, WAMS and other smart energy practices, as well as analysis of major power-system events, including cascading blackouts and voltage stability. Training was also intended to address harmonized protection relay settings and the use of analytical tools such as DigSilent.

Additional activities would build understanding of power-system flexibility, suitable policy and market design, and wholesale settlement practices using the proposed metering arrangements. Domestic workshops were intended to share findings with energy-sector stakeholders, including the Ministry of Energy. The plan also included exploring ways to engage more female staff in smart energy system work at the NDC.

These elements are important because an investment plan must connect equipment and systems to operating procedures, institutional responsibilities and staff skills. The report’s intended outputs were a feasibility study and action plan for 2020–2025, an investment plan, and due diligence for a prioritized project. The technical assistance was approved in 2019, with an indicative implementation period from November 2019 to December 2021; these dates describe the original plan, not a statement of present-day project status.

Practical implications for grid planners

Mongolia’s approach highlights several considerations for utilities and system integrators planning grid modernization:

  • Start with operational gaps. Define where visibility, dispatch, settlement or restoration capabilities are limited before selecting technologies.
  • Plan for system-wide coverage. Consider how central and regional control arrangements will share information and responsibilities.
  • Connect grid data to market processes. Metering infrastructure can support both operational understanding and transparent financial settlement.
  • Include resilience in the architecture. Backup control arrangements and cybersecurity measures belong in modernization planning.
  • Invest in operator capability. Training in system analysis and new tools helps organizations make use of technology investments.

Conclusion

For Mongolia, smart grid modernization was framed as a coordinated program of network monitoring, dispatch improvements, metering and market support, resilience planning, and workforce development. The central practical lesson is that renewable integration depends on more than adding generation: operators also need the data, control structures and skills to manage a changing power system. A feasibility study that links these requirements to a prioritized investment plan can help decision-makers evaluate how technology and institutional changes fit together.