Monitoring-based commissioning (MBCx) gives facility teams a repeatable way to use energy and operational data to maintain and improve building performance. Rather than relying only on periodic reviews, teams monitor system behavior over time, investigate issues revealed by the data, and verify that corrective actions have worked. The approach is commonly applied to HVAC and lighting, and can also be used with other energy-consuming systems.
For industrial automation professionals and building operators, MBCx connects control-system data with practical operational decisions. Energy metering, building automation system (BAS) trend logs, and analytics can help teams spot equipment that is operating out of schedule, identify control sequences that need attention, and follow up after changes are made.
How monitoring-based commissioning works
MBCx is an ongoing cycle with three core activities: collecting data, analyzing it, and acting on the findings. Each step matters. Analytics can highlight a possible fault, but someone still needs to determine its cause, make an appropriate change, and confirm the system performs as intended.
- Collect energy and operational data. Gather metering and system information from energy-consuming equipment. BAS trend logs can provide operating data that helps put energy use and equipment behavior in context.
- Use analytics to identify issues and opportunities. Fault detection and diagnostics (FDD), energy information systems (EIS), and trend-log analysis can reveal abnormal behavior or areas for investigation.
- Investigate, improve, and verify. Determine the underlying cause, implement an operational improvement, and check subsequent performance to confirm the issue has been addressed.
These tools are types of energy management and information systems (EMIS). FDD and EIS can help teams review more system information than is practical to assess manually. The goal is not simply to generate alerts; it is to use evidence to guide investigation and improvement.
Why MBCx helps sustain building performance
Existing building commissioning (EBCx) is used to address energy waste and operational issues in existing facilities. The source guidance describes potential EBCx energy savings of 5â15% and recommends repeating the process every three to five years to address performance degradation over time. MBCx can complement this work by providing ongoing visibility between commissioning efforts and helping teams look for additional opportunities.
Analytics software can review data from many HVAC components and flag conditions that warrant attention. This can make it possible to investigate opportunities that would be difficult or uneconomical to find through manual analysis alone. Ongoing monitoring can also help teams notice when system performance moves away from its intended operation, so they can investigate before the condition develops into an occupant-comfort problem.
MBCx is also associated with potential reductions in energy waste, improved occupant comfort, and longer mechanical equipment life through low-cost operational improvements. These outcomes depend on identifying relevant issues and following through with effective corrective actions; monitoring itself does not replace operational expertise.
Use an MBCx plan to define roles and responsibilities
Because MBCx is not yet a routine practice in every organization, a written plan can help turn the concept into a manageable process. Lawrence Berkeley National Laboratory (LBNL) developed an MBCx Plan Template to guide project planning. It is intended for use by building staff, such as an energy manager, or by a third-party commissioning provider.
A plan establishes the process for internal and external participants and clarifies their responsibilities. It can include background information, guidance on best practices, and supporting materials such as a Monitoring Action Plan. Teams can tailor the template to the scope and needs of their own MBCx program rather than treating it as a fixed design.
For a facility team, planning should connect the monitoring work to decisions and follow-up. It is useful to establish how data will be reviewed, who will investigate flagged conditions, how improvements will be assigned, and how performance will be verified. The plan provides a shared reference for carrying these activities out step by step.
Choose an implementation model that fits the team
MBCx can be managed in-house, supported by external specialists, or delivered through a combination of the two. The appropriate division of work depends on the organizationâs capabilities and chosen tools. Common options include:
- Analytics: Use vendor software, or develop an EMIS by programming FDD rules and adding metering to the BAS.
- Data review: Have in-house staff review dashboards, key performance indicators, and reports; use remote analysis from an EMIS service provider; or engage a commissioning authority for onsite or remote review.
- Corrective work and verification: Assign the in-house team to implement fixes and verify performance, or use an MBCx service provider for implementation and verification.
Whichever model is selected, responsibility for acting on findings needs to be clear. A tool can surface a schedule issue or control fault, but the organization must have a defined path to assess the alert, authorize a change, and check the result.
What FDD can reveal in building systems
FDD analysis can examine a range of equipment and operating conditions. Examples include air handling units, terminal units, chillers, boilers, pumps, cooling towers, plug and process loads, and garage exhaust fans. General checks can identify equipment running outside scheduled hours or manual overrides that may no longer be needed.
For air handlers, analysis can help teams investigate whether ventilation rates are adequate, or whether a rooftop unit or air handling unit is bringing in excessive outside air when it is not in economizer mode. FDD can also flag simultaneous heating and cooling, including cases where heating, economizer cooling, or mechanical cooling may be occurring at the same time. These findings are prompts for investigation: operators need to assess the system and its operating requirements before deciding on a corrective action.
Make monitoring part of ongoing operations
MBCx offers a structured way to turn building data into operational follow-through. A practical program combines metering and BAS information with analytics, defined responsibilities, and verification after improvements. By choosing an implementation model that fits available resources and using an MBCx plan to coordinate the work, facility teams can investigate performance issues more consistently and support better-informed decisions about building systems over time.
Access Official Technical PDF